Service · Shoals Area, AL
Bathroom Remodeling
Tubs, tile, and a bathroom that feels like you added square footage. Even when you didn’t.
What’s Included
Full bath, half bath, or down to the studs.
We scope the work to the bathroom you have and the one you want. Here’s what a typical remodel covers.
- Tub or shower replacement, including tile surround
- Wall and floor tile
- Vanities, countertops, and sink install
- Mirrors, lighting, and exhaust fans
- Plumbing fixtures (faucets, shower valves, toilets)
- Niches, shelving, and glass enclosures
- Flooring: tile, LVP, or refinishing
- Electrical updates to current code
- Debris haul-off (daily cleanup, nothing left behind)
Our Process
How a Freedom Works project runs.
1. Walkthrough
We come out, see the space, listen to what you want. No charge. No pressure.
2. Design & Quote
You get a clear written scope and price. No vague estimates. No surprise charges down the road.
3. Materials
We help you pick, or you source your own. Your call. We’ll point you to showrooms we trust.
4. Build
We show up when we say we will, work clean, and keep you in the loop. Daily cleanup included.
5. Final Walkthrough
We don’t leave until you’re ready to use the space. If something’s off, we fix it before we go.
6. After
Workmanship warranty. Something comes up a year later, call us. We’re not going anywhere.
Recent Work
Jobs We’re Proud Of
A few of the projects we’ve wrapped across the Shoals. More in the full gallery.
Deck Photos
Deck Photos
Deck Photos
Deck Photos
Deck Photos
Deck Photos
Why Us
Why homeowners pick Freedom Works.
Licensed & Insured
Alabama HBLB licensed, fully insured. Ask to see it. We’ll show you.
Local & Family-Run
Two brothers from the Shoals. Our name is on it, and our neighbors see our work every day.
Built Right
Measure twice, cut once. We don’t cover up what needs fixing. We stand behind the work.
Questions We Hear a Lot
Bathroom Remodel FAQ
How long does a full bath remodel take?
Most full baths run 2-4 weeks. A primary bath with custom tile or a walk-in shower can take 4-6 weeks depending on material lead times.
Can you work around our schedule if it’s our only bathroom?
Yes. We can sequence the work so the bath is usable overnight, or coordinate with you if a short down period is needed. Say the word up front and we plan around it.
Do you handle tile and fixture selection?
Yes. We’ll point you to local tile and plumbing showrooms we trust, or we can source and recommend if you’d rather not shop.
Will you reuse any of our existing fixtures?
If a fixture is in good shape and you want to keep it, we’ll reinstall it. We’ll flag anything we’d recommend replacing and tell you why.
What’s your warranty?
Workmanship warranty on everything we install. Something goes wrong, call us.
Ready When You Are
Let’s Walk Your Project.
Free walkthrough. Honest quote. No pressure. Most jobs get a written estimate within 48 hours.